Technical documentation
Verified documents only.
Saltra LFP will not publish random supplier PDFs as proof. Documents must match the exact cell model, supplier channel, certificate scope, and actual inventory before customer use.
Documentation rule
PDFs are not proof by themselves.
Supplier documents must be matched against real cells, QR codes, production dates, and certificate scope.
Verification checklist
What Saltra checks before quoting or purchasing.
| Document | Status | Requirement |
|---|---|---|
| Cell datasheet | Required | Must match exact manufacturer, model, and production batch. |
| QR traceability | Required | Actual-cell QR photos and traceability method required before purchase. |
| UN38.3 / SDS | Required | Transport and safety documents must be tied to the exact product scope. |
| IEC / UL scope | If applicable | Certificate must clearly state whether it covers cell, module, battery, or system. |
| Capacity / IR report | Required | Batch test report needed before sample or pilot purchase. |
| Warranty terms | Required | Defective-cell replacement process must be documented. |